Solar Installations

  • Broome Boulevard Solar Car Park

    The project executed under our JV with H&M Tracey involved the design, procurement and construction of 1.36MW of Solar PV enabling the owner to offset against the rising costs of energy, whilst improving the aesthetic of the complex and providing shaded parking for its patrons. The project includes a Battery Energy Storage System (BESS) which has 1MW of discharge capability.

    1,363MWp / 1MW Solar
    Battery Capacity - 1MW / 571kWh BESS
    4 x Solar carports providing 7,000m2 of coverage
    Largest solar car park in Northern Australia or a wind region.

    Location: Broome, Western Australia

  • Derby Hospital

    The Derby Hospital solar project for Horizon Power & WA Country Health is executed as a JV with H&M Tracey. This project will see a 364kW solar system installed with feed-in management to the Horizon grid. Horizon Power connection applications and approvals for each system, structural certifications, and building permits will be managed by the project.

    364kWp / 315kW Solar
    Feed-in Management System

    Location: Derby, Western Australia

  • Solar Schools Program

    On behalf of the Department of Education and Horizon Power, GenOffGrid is engaged to complete the design, supply, and installation of solar systems at 19 schools throughout the Pilbara, Gascoyne and Kimberley regions, installing 520kw of Solar.

    520kWp / 400kW Solar
    Feed-in-Management Systems at various schools

    Location: Pilbara, Gascoyne & Kimberley Schools

  • Karratha Adventure Sports

    An upgrade to an existing solar system to bring respite to rising power bills, our local GenOffGrid Pilbara based in Karratha designed and installed the solar & battery system for Karratha Adventure Sports. The system includes 91kW PV and a battery storage system covering their late afternoon energy requirements.

    91kWp / 80kW
    Battery Capacity 19kWh
    Feed-In-Management System

    Location: Karratha, Western Australia